Park Street St Kilda Drivers Facilities

Monday 23 September to early November 2024

The Department of Transport and Planning and Yarra Trams regularly carry out maintenance works and upgrades across the network to improve operations and safety. One of these upcoming improvements will be the installation of new drivers facilities at the tram terminus in Park Street, St Kilda.

These new facilities will replace the temporary toilets that have been in place for many years, they will be located on the platform of the terminus. City of Port Phillip has been consulted regarding these facilities for our staff.

To minimise construction impacts, we will prefabricate the facility offsite and then install the new facility from late September. Some civil works will be required to install the facility and provide water and electricity connection.

The facility will be for the sole use of tram drivers and other public transport staff. The facilities will be locked at all times and not accessible to the public.

Where?

Park Street Tram Terminus, Park Street, St Kilda

When?

  • Works are expected to start on Monday, 23 September 2024 and expected to be complete by early November 2024.
  • Works will occur:
    • 7am to 5pm, Monday to Friday.
    • 7am to 3pm, Saturday and Sunday (if required).

What is happening?

  • Setting up site involving temporary fencing.
  • Civil works to connect to utilities.
  • Works to relocate existing tram infrastructure assets on the platform.
  • Installation of new driver facilities on the terminus platform.
  • Installation of CCTV cameras for safety.
  • Installation of new pedestrian crossing.

What to expect?

  • Setting up site, including traffic management and temporary facilities for the contractors.
  • Vehicles, machinery and contractors on site.
  • Mostly low, with some medium level noise.
  • Brief periods of high level noise when saw cutting.
  • Footpaths will remain open at most times, with pedestrian detours in place as required to safely undertake some works.
  • The work site at the West Beach Street end of the platform will be fenced for safety, with no passenger access for the duration of the works. Passenger access to the platform will remain at the crossing at the Fitzroy Street end of the platform.
  • Road closure on Park Street south bound while pedestrian crossing and sewerage connection is installed.
  • Tram services will not be affected.

Please follow signage and any instruction from contractors around the work zone.


Works are dependent on weather and subject to change. We appreciate your patience while these works are completed.