June 2015 performance results

10 July, 2015

June 2015 saw improvements in both service delivery and punctuality, with 99.39 per cent of timetabled services delivered and 85.18 per cent of these services arriving on time. Minor adjustments to the timetable on 21 June to reflect changes in operating conditions have already improved performance.  

Factors affecting punctuality were third party incidents and tram infrastructure upgrades. This included a day with both a gas leak on Punt Road and a major CBD rally, as well as track renewal at several locations on the network including Swanston Street at Federation Square and High Street in Preston.

Performance by lines is shown below.

Brunswick 

June 2015_Brunswick

Camberwell 

June 2015_Camberwell

East Preston 

June 2015_East Preston

Essendon 

June 2015_Essendon

Glenhuntly 

June 2015_Glenhuntly

Kew 

June 2015_Kew

Malvern 

June 2015_Malvern

Southbank 

June 2015_Southbank

Android App
iPhone App
Tramtracker Website App
OR
Journey Planner logo
at  :

This requires Adobe Flash Player to view. Download the most recent version of Adobe Flash Player here.


Get Adobe Flash player