August 2015 performance results

9 September, 2015

Punctuality and service delivery were fairly consistent in August 2015 with the same time last year, with 99.12 per cent of timetabled services delivered and 85.58 per cent of these services arriving on time. This was despite industrial action that occurred at the end of the month.

The new platform stops on St Kilda Road between Domain and Southbank Boulevard are now open, and will deliver long-term benefits to this corridor.

The roll out of next generation E-Class trams on the network continues, with six trams now in service on Line 11 and a total of 27 in service across the network.

Brunswick

 August 2015 performance_Brunswick

Camberwell

 August 2015 performance_Camberwell

East Preston

 August 2015 performance_East Preston

Essendon

 August 2015 performance_Essendon

Glenhuntly

 August 2015 performance_Glenhuntly

Kew

 August 2015 performance_Kew

Malvern

 August 2015 performance_Malvern

Southbank

August 2015 performance_Southbank

Android App
iPhone App
Tramtracker Website App
OR
Journey Planner logo
at  :